Shower Tile Calculator & Material Planner

Three shower walls, floor tile, waterproofing, mortar and drain.

How estimates work

Project estimate

Shower Tile Planner

$1,265–$1,455

Material estimate + optional reserve · USD

Tiled walls
94 ft²
Shower floor
15 ft²
Working time allowance
1.26 days

20.17 person-hours / 2 people / 8 h per day. Provisional activity rates; adjust in advanced options.

Excludes labor, tax, delivery, equipment rental, permits and site work. Sample prices are not live retailer quotes. Upper budget includes 15% contingency.

Cost breakdown
Tile
$665
Waterproofing
$300
Mortar
$150
Drain
$150

Shopping list

0 / 6 checked

Whole packages rounded up. Edit a unit price to use your supplier's quote.

Tile

  • Wall tile boxes

    11 boxes

    $495
  • Floor mosaic (1 sq ft)

    17 sheets

    $170

Waterproofing

  • Waterproofing membrane

    120 ft²

    $300

Mortar

  • Floor mortar

    5 bags

    $75
  • Thinset (50 sq ft)

    3 bags

    $75

Drain

  • Drain / waterproof transition kit

    1 kit

    $150

Save this project

Saved on this browser only. No account required.

Assumptions & project notes

  • Material allowance: 10%. Package sizes and coverage rates are editable in the inputs.
  • Three walls and one open face. Substrate, slope, flood testing and drain compatibility must follow the selected waterproofing system.
  • Check final dimensions, product specifications and any required local approvals before ordering.

Tools & preparation

  • Tape measure, straightedge and level
  • Marking and layout tools
  • Suitable cutting and fastening tools
  • Product-specific preparation and finishing tools

A preparation list; confirm installation tools with your selected products.

How to use the shower tile planner

Start with length, width, height. The result includes tiled walls, shower floor. Open advanced options to match your product sizes, material allowance and labor expectations.

1. Measure and specify

Measure each room or surface and identify openings, edges, fixtures and transitions.

2. Adjust the estimate

Check package coverage, material orientation, pattern alignment and substrate requirements.

3. Prepare your order

Review full-piece cuts and matching accessories; order from consistent product batches where needed.

4. Plan the work

Prepare the surface and follow the product installation and finishing sequence, including drying or curing periods.

Frequently asked questions

What does the shower tile planner estimate?+

Three shower walls, floor tile, waterproofing, mortar and drain. The shopping list includes wall tile boxes, floor mosaic (1 sq ft), waterproofing membrane, floor mortar, thinset (50 sq ft), drain / waterproof transition kit.

Which assumptions should I check?+

Three walls and one open face. Substrate, slope, flood testing and drain compatibility must follow the selected waterproofing system.

Are the prices current supplier quotes?+

No. Initial unit prices are illustrative USD budgeting inputs. Enter a price beside each material to use your own quote. The total includes materials only; labor, shipping, taxes, permits and rental are excluded.

Can I save or share my project?+

Save stores the inputs and prices on this browser. Share link includes the configuration in the address so another device can reopen it. Download CSV exports the shopping list, and Print / PDF opens your browser’s print dialog.

Related calculators